Delta Base:12th Launch Bay/NHFD: Difference between revisions

From Ages and Alternities
Jump to navigation Jump to search
(New page: This floor is mostly one increadibly large room resemabling a hanger bay. In one corner there is an elevated control room that oversees the opperation of the NHFD as well as the floor con...)
 
No edit summary
 
Line 1: Line 1:
This floor is mostly one increadibly large room resemabling a hanger bay.  In one corner there is an elevated control room that oversees the opperation of the NHFD as well as the floor contols that allow vehicles to be raised and lowered from the floor below.  The NHFD takes up almost the entire north wall but so far no agent has ever seen it opened beyond about 10 yard the wall behind the NHFD can be opened to allow air access to the surface.
This floor is mostly one increadibly large room resemabling a hanger bay.  In one corner there is an elevated control room that oversees the opperation of the NHFD as well as the floor contols that allow vehicles to be raised and lowered from the floor below.  The NHFD takes up almost the entire north wall but so far no agent has ever seen it opened beyond about 10 yard the wall behind the NHFD can be opened to allow air access to the surface.
Return to [[Delta Base]]<br>
[[Category:Delta Base]]

Latest revision as of 22:01, 21 August 2009

This floor is mostly one increadibly large room resemabling a hanger bay. In one corner there is an elevated control room that oversees the opperation of the NHFD as well as the floor contols that allow vehicles to be raised and lowered from the floor below. The NHFD takes up almost the entire north wall but so far no agent has ever seen it opened beyond about 10 yard the wall behind the NHFD can be opened to allow air access to the surface.



Return to Delta Base